Maximum-Capacity Integrated Production Architecture
At 32T system scale, ZR BREW engineers a fully integrated industrial winery production line — not a collection of individual tanks. Every component, from fermentation and storage vessels to glycol circuits, CIP piping, and access platforms, is designed as a unified system, ensuring process continuity, utility efficiency, and operational coherence across the entire production facility.
Industrial-Grade PLC Automation with Multi-Vessel Monitoring
The 32T system is built around industrial-grade PLC process control, with PT100 temperature sensors installed on every fermentation and storage vessel and connected to a central control interface. Operators can monitor and regulate temperature, manage cooling circuit allocation, and log batch data across all tanks simultaneously — delivering the level of process discipline required for high-throughput industrial wine production.
Multi-Tank Glycol Cooling Manifold for Independent Temperature Zones
At 32T production scale, different tanks frequently hold different grape varieties, wine styles, or production stages with distinct temperature requirements. ZR BREW’s multi-tank glycol cooling manifold allows each vessel to maintain its own target temperature zone independently, enabling true multi-varietal, multi-stage production management within a single connected winery system.
Industrial CIP Sanitation Serving the Full 32T System
ZR BREW integrates a full industrial CIP (Clean-In-Place) circuit serving every fermentation and storage vessel in the 32T system, with dedicated cleaning supply and return piping, individual tank spray ball coverage, and programmable multi-stage cleaning sequences. This eliminates manual vessel-entry cleaning across a large-scale winery facility, dramatically reducing labour requirements and supporting continuous production scheduling.
Site-Specific Engineering for Industrial Facility Integration
A 32T winery system requires precision-engineering of tank positioning, utility routing, platform access, and floor load distribution for each installation site. ZR BREW’s engineering team delivers full site-specific 2D and 3D layout design for each project, coordinating tank arrangement, glycol circuit layout, CIP distribution piping, and process platform placement to match your exact facility dimensions, structural loading, and winery workflow.
Complete Industrial Project Support from Factory to Full Commissioning
ZR BREW provides full industrial project lifecycle support for each 32T system installation: factory-inspected fabrication with weld documentation and jacket pressure testing, English-language installation and commissioning manuals, remote engineering support during installation, and optional on-site commissioning by ZR BREW’s technical team — ensuring the system is fully tested, calibrated, and production-ready before handover.