500L Brewery Equipment

ステンレス製円錐形発酵槽

500L Brewery Equipment

500L Brewery Equipment
500L Brewery Equipment
500L Brewery Equipment
500L Brewery Equipment
500L Brewery Equipment
500L Brewery Equipment
500L Brewery Equipment
500L Brewery Equipment
500L Brewery Equipment
500L Brewery Equipment
500L Brewery Equipment
500L Brewery Equipment
ZR-500

500L Brewery Equipment

High-Efficiency 3-Vessel Brewhouse Commercial Steam Heating System Fully Automated PLC Siemens Control

商品説明:

The ZR BREW 500L brewery equipment is a professional, turnkey brewing solution engineered for brewpubs, restaurants, hotels, and start-up microbreweries. Capable of producing up to three batches per day, this 5hl system features an optimized 3-vessel brewhouse powered by a highly responsive steam heating system. Manufactured in our 10,000㎡ facility strictly using premium SUS304 stainless steel, it is equipped with a fully automated Siemens PLC control panel for precise recipe execution and temperature management. With its commercial-grade reliability and compact footprint, this equipment ensures consistent, high-quality craft beer production for overseas B2B buyers.

無料見積もりを依頼する

Product Parameters

Item Specification
モデル ZR-500
Production Capacity 500L / Batch (Up to 3 batches/day)
Effective Volume 500L
素材 SUS304 Stainless Steel
Brewhouse Combination 3-Vessel
用途 Restaurant / Bar / Hotel / Brewery
Heating Way 蒸気暖房
制御システム Fully automated with PLC Siemens
電圧 Three-phase: 380(220, 415, 480…)v/50(60)Hz
Power Requirement 10KW (Specific to steam heating configuration)
Water Consumption 2.9 T
Floor Space Required 40 – 60 ㎡
Minimum Roof Height 3000 mm
注記 1 Barrel (BBL) = 117 Liter; 1 HL = 100 Liter; 1 Gallon = 3.7854 Liter

 

モデル Production Capacity Power Water Consumption (T) Floor Space (㎡) Roof Height (mm)
ZR-500 500L/Batch Electric heating: 55KW; Steam/direct fire: 10KW 2.9 40–60 3000
ZR-600 600L/Batch Electric heating: 60KW; Steam/direct fire: 15KW 3.6 40–60 3200
ZR-700 700L/Batch Electric heating: 65KW; Steam/direct fire: 20KW 4.2 50–70 3200
ZR-800 800L/Batch Electric heating: 70KW; Steam/direct fire: 20KW 4.8 50–70 3200
ZR-1000 1000L/Batch Electric heating: 80KW; Steam/direct fire: 25KW 6 70–120 3500
ZR-1500 1500L/Batch Steam/direct fire: 130KW 9 100–200 4100
ZR-2000 2000L/Batch Steam/direct fire: 140KW 12 150–250 4400
ZR-2500 2500L/Batch Steam/direct fire: 150KW 15 180–300 4900
ZR-3000 3000L/Batch Steam/direct fire: 200KW 18 200–350 4900
ZR-5000 5000L/Batch Steam/direct fire: 300KW 30 400 and above 6000

 

構成のメリット

Optimized 3-Vessel Brewhouse: Designed as a professional 3-vessel system, it strikes the perfect balance between compact floor space and commercial brewing efficiency. It provides superior wort clarity, faster lautering times, and allows brewers to easily achieve up to 3 batches per day.

Steam Heating Technology: Utilizes a steam heating system, which ensures even heat distribution, prevents wort scorching (caramelization), and offers rapid, highly responsive temperature control during the boiling process.

Siemens PLC Automation: Comes standard with a fully automated Siemens PLC control system. It allows brewers to easily edit and store recipes, manage precise temperature zones, and accurately control water feeding and mixing with a user-friendly touch screen.

Premium SUS304 Sanitary Construction: Built entirely with commercial-grade SUS304 stainless steel. All tanks feature sanitary piping, valves, and high-efficiency CIP cleaning capabilities to maintain absolute microbiological safety.

Optimized Glycol Cooling: The insulated glycol liquid holding system calculates exact cooling capacities, working seamlessly with the two-stage wort heat exchanger and fermentation tanks to lock in flavor and save energy.

Turnkey B2B Delivery: Engineered for a 40-60㎡ footprint, ZR BREW handles the complete project lifecycle—from tank design and fabrication to global shipping, detailed English manuals, and optional on-site commissioning.

500L Brewery Equipment

関連商品の表示

よくある質問

  • What is the heating method of this 500L brewery equipment?

    This specific 500l brewery equipment configuration utilizes a highly efficient steam heating system. Steam heating provides gentle, even boiling, preventing wort scorching and ensuring excellent brew quality for commercial operations.

  • Is the control system fully automatic?

    Yes, this system is equipped with a fully automated Siemens PLC control panel. It features a touch-screen interface for precise temperature control, flow metering, automatic mixing, and recipe storage, significantly reducing manual labor.

  • What brewhouse vessel combination is this model?

    This ZR-500 model is configured with an advanced 3-vessel brewhouse. This 3-vessel setup is highly favored by commercial brewpubs because it significantly increases brewing efficiency and throughput compared to basic 2-vessel systems, without requiring the massive floor space of a 4-vessel plant.

  • What are the facility requirements (space and power)?

    The equipment requires a floor space of 40-60㎡ and a minimum ceiling height of 3000mm. It runs on a three-phase power supply (380v/220v/415v/480v, 50/60Hz).

  • What is the delivery time and payment term?

    The lead time for a complete turnkey brewery project is 40 working days after finalizing the drawing. Our standard payment terms are T/T (40% advance payment to start production, 60% balance before shipping), PayPal, or Trade Assurance.

ステンレス製円錐形発酵槽

オーダーメイドのソリューションについては、お気軽にお問い合わせください

醸造能力を向上させる準備はできていますか?今すぐお問い合わせください。プロジェクトの要件についてご相談いただき、無料でカスタマイズされた提案書をお受け取りいただけます。.

    24時間以内にご返信いたします。お急ぎの場合は、WhatsAppまたはWeChatのIDを追加してください: +86 131 8893 2181,.

    *お客様のプライバシーを尊重し、すべての情報を厳重に保護いたします。.

    お客様の情報は、お問い合わせへの回答にのみ使用し、未承諾のメールや宣伝メッセージを送信することは一切ありません。.

    お見積りをご依頼ください

      24時間以内にご返信いたします。お急ぎの場合は、WhatsAppまたはWeChat(+8613188932181)までご連絡ください。.

      *当社はお客様のプライバシーを尊重し、すべての情報を保護いたします。.

      お客様の情報は、お問い合わせへの回答にのみ使用し、未承諾のメールや宣伝メッセージを送信することは一切ありません。.