Brewery equipment is grouped by process stage: milling and brewhouse, fermentation and bright tanks, cold-side utilities, filtration, and packaging. The right set depends on batch volume. ZR Brew builds systems from 50L pilot units to 150HL commercial breweries, with heating by electric, steam or direct fire and PID or PLC control.
Compared with generic commercial-kitchen equipment checklists, which rarely reach brewhouse or cellar engineering, this guide follows the beer itself: grain in, packaged beer out. Each section names the equipment at that stage, the decision it forces, and the published ZR Brew parameters where they exist. Prices are not listed, because none are published; the cost section explains what drives a quotation instead.

Brewery equipment at a glance: grain in, packaged beer out
Stage Equipment Decision it forces
- Grain handling Malt mill, corn hammer mill, screw conveyors, tube-chain conveyors How much grain is moved by hand
- Brewhouse Two- to five-vessel brewhouse Batch size and brews per day
- Fermentation Cylindroconical fermenters, unitanks How many tanks sit in rotation
- Conditioning Bright beer tanks Carbonation and a buffer before packaging
- Cold side and utilities Glycol chiller, steam generator, water treatment, CIP, CO₂ recovery, yeast propagation Whether the building can host the system
- Finishing Filters, centrifuge, hop gun, sterilization equipment Clarity versus the effort of an extra step
- Packaging Keg washer and filler, bottling, canning Weekly throughput and beer loss
- Controls PID or PLC panels Repeatability and operator training
Everything upstream of the fermenters is sized in batch volume. Everything downstream is sized in weekly volume. Mixing those two units up is where most first equipment lists go wrong.
Which capacity tier fits your brewery?
ZR Brew groups its brewery systems into four tiers.
| Tier |
Batch capacity |
Where it usually fits |
| Home and pilot |
50L–200L |
Home brewing, recipe trials, pilot production |
| Nano |
2HL–10HL |
Bar and restaurant brewing, small craft production |
| Micro |
12HL–40HL |
Microbrewery production |
| Commercial |
45HL–150HL |
Commercial beer production |
Published throughput markers help set expectations. A 10HL four-vessel system is listed at up to about four batches per day, and 20HL–50HL four-vessel systems at up to about six, both subject to the process, the operating schedule and the configuration. Treat those as ceilings under good scheduling. They are not planning numbers.
The planning number comes from the cellar. Here is the arithmetic with illustrative assumptions (replace them with your own recipes): a brewery that brews three times a week, with ales that occupy a fermenter for 14 days from knockout to transfer, needs at least six batch-size fermenters in rotation (3 batches a week × 2 weeks). Bright tanks and cleaning gaps come on top. The brewhouse could run four times a day and the cellar would still set the output. Lagers, which spend longer in cold conditioning, push the count higher.

Brewhouse: vessel count, heating and control
The brewhouse is where grain becomes wort, and its first specification is the number of vessels. ZR Brew builds two-, three-, four- and five-vessel configurations. Exactly which operations share a vessel varies between designs, so ask for the process-flow drawing rather than relying on the label. In general, fewer vessels cost less and take less floor space, but they make the steps wait for one another. More vessels let one batch boil while the next one mashes, which is how the four-vessel systems above reach several brews in a day.
Heating comes in three forms: electric, steam or direct fire. The choice depends on system size and site conditions, so start from the utilities you actually have. Electric heating needs sufficient electrical capacity at the building. Steam needs a steam source, and a steam generator is part of the supporting equipment range. Direct fire needs a gas supply and a plan for the combustion side of the room. Picking the heating method before surveying the site is how a brewery ends up paying for an electrical upgrade or a new gas line late in the project.
Control is either PID or PLC. A PID setup holds temperatures at set points while the brewer drives the sequence by hand. A PLC adds programmed step sequences, so the same brew runs the same way each time, at the price of a higher panel cost and more operator training. ZR Brew lists Siemens, Schneider and Allen-Bradley automation components, or other agreed brands depending on the project. Pumps, electrical parts and control devices may come from established suppliers, while most core stainless steel vessels are made in-house.
The standard material is food-grade stainless steel, normally SUS304. Other materials are subject to confirmation for the project.

ZR-1000 to ZR-5000: the published brewery specification
This is the part of the guide that applies specifically to ZR Brew’s brewery equipment line. The representative public models are ZR-1000, ZR-1500, ZR-2000, ZR-2500 and ZR-5000.
| Parameter |
Published value |
| Batch capacity |
50L to 150HL across the line |
| Brewhouse structure |
Two-, three-, four- or five-vessel |
| Materiál |
Food-grade stainless steel, normally SUS304; other materials subject to project confirmation |
| Heating |
Electric, steam or direct fire |
| Control |
PID or PLC |
| Automation brands |
Siemens, Schneider, Allen-Bradley, or other agreed brands |
| Batches per day (published examples) |
About four for 10HL four-vessel; about six for 20HL–50HL four-vessel |
| Applications |
Home, pilot, bar, restaurant, craft, microbrewery and commercial brewing |
The capacity assigned to each model number is confirmed in the quotation. Do not infer it from the number itself.
Milling and conveying: the stage buyers budget last
ZR Brew’s range includes malt mills, a commercial corn hammer mill, standard and 90-degree screw conveyors, and tube-chain conveyors. The mill sets the crush of the grist, which in turn affects how cleanly the mash drains. The corn hammer mill matters if your recipes use corn or similar adjuncts, and it can be skipped if they do not.
At 50L–200L, carrying sacks to the mash tun is workable. As batch size grows, the repeated lifting becomes the slowest and most injury-prone part of the brew day, and that is where conveyors earn their place. Decide this while the floor plan is still on paper, because a screw conveyor needs a straight run and a clear path from the mill to the brewhouse.
Fermenters and bright tanks, sized by tank-days
ZR Brew’s fermentation line, the ZR-FV series, runs from ZR-FV-100L through ZR-FV-5000L, plus BBL-based sizes such as ZR-FV-10BBL. The published parameters:
- Nominal capacity of about 100L–5000L
- SUS304 construction, with SUS316 options depending on project requirements
- Glycol cooling jackets on a vertical insulated vessel
- A configurable top or side manway
- A commonly used 60-degree conical bottom
- A typical working pressure of about 0.2 MPa (30 psi), depending on the model
Ports, valves, cooling zones, pressure settings, surface treatment and dimensions can be configured.
One edge case deserves attention: nominal volume is not usable volume. A published 3000L model lists a total volume of about 3750L, a 100 mm insulation layer and 0.2 MPa working pressure. The extra 25% is headspace for foam and krausen. Those figures describe that one configuration only and should not be applied to other fermenters. Always ask for total volume and working volume separately.
Unitank or separate bright tank? A unitank ferments and conditions in one vessel, which saves tanks and transfers. A separate bright beer tank frees the fermenter for the next batch and gives you a buffer between the cellar and the packaging line. If your tank-days calculation shows fermenters are the constraint, bright tanks pay for themselves in recovered fermenter time.
Utilities that decide whether your building can host the system
Chilling, steam, water and cleaning rarely feature in a first equipment list, and they often decide the schedule. ZR Brew’s supporting range covers glycol chillers, steam generators, water-treatment systems, CIP systems, CO₂ recovery and yeast-propagation equipment.
Three checks catch most problems:
- Glycol capacity against simultaneous demand. Wort cooling and several fermenters can all call for cold at the same moment. Size the chiller for the busiest hour, not the average one.
- Water quality and drainage. Water-treatment needs depend on the supply at your address, and CIP and cooling water have to go somewhere.
- Steam, gas or power at the point of use. The heating method from the brewhouse section has to land on a real connection.
For this reason ZR Brew’s pre-sale work includes a site and utility evaluation and two- and three-dimensional layouts. Ask for the layout before you sign, because a clash between a tank’s height and your ceiling is far cheaper to find on a drawing.

Filtration and finishing
Filtration, centrifuges, hop guns and sterilization equipment sit between the cellar and the package. Not every beer needs them, and the choice depends on style: filtering gives a brighter beer, and a heavily hopped or naturally hazy style may be better left unfiltered. A plate-and-frame filter is a compact option, and filter plate quantity can be expanded later if volume grows. Specify throughput and cleaning method in the quote, because those numbers are not standardized across the range.
Packaging lines: kegs, bottles and cans
ZR Brew‘s keg equipment includes automatic keg washing and filling lines, all-in-one washer-fillers with a lifting table or a fixed table, and one- or two-station keg fillers with a flow meter. Operation can be manual, semi-automatic or fully automatic, and PLC-controlled versions are available. Published figures that you can use:
- About 60–80 kegs per hour for one fixed-table configuration
- Beer loss below 1% for one specified automatic line
Both numbers belong to those named configurations and cannot be carried over to a different machine. Bottling and canning are within the product scope, but standardized throughput tables are not published for them, so request throughput in writing before comparing bids.
Seven checks before you ask for quotes
- Write down annual volume and styles. Convert them to batches per week, because the rest of the list depends on that number.
- Run the tank-days calculation. Batches per week × weeks each batch occupies a tank gives your fermenter count. Add bright tanks if you want the buffer.
- Survey the site. Record power capacity, gas supply, water supply and drainage, ceiling height, door width and the available steam source, if any.
- Choose heating and control from what the site allows. Match the heating method to the utility that exists, and match PID or PLC to who will run the brew day.
- List your package formats and peak weekly throughput. Kegs, bottles and cans each need a different line.
- Send the same brief to two or three suppliers. Ask for itemized quotes, process-flow drawings, a 2D or 3D layout, material grade, component brands and lead time, so the bids line up.
- Ask what happens after delivery. Request inspection videos, pressure-test records, installation support terms, the documentation language and the spare-parts process in writing.
Často kladené otázky
What equipment does a small brewery need to start brewing?
A brewhouse, fermenters sized to your weekly volume, a glycol chilling circuit, a cleaning (CIP) arrangement and a way to package, such as a keg filler. A malt mill is the usual extra at the front. Bright tanks, filtration and bottling or canning can be added as volume grows.
How many fermenters do I need for one brewhouse?
Multiply batches per week by the number of weeks each batch stays in a tank. The worked example in the capacity section shows the arithmetic and why the brewhouse’s maximum brews per day is not the planning figure.
Should I choose electric, steam or direct-fire heating?
ZR Brew offers all three, and the right one follows system size and the utilities at your site. Survey power, steam and gas availability first, then pick the method that connects to what already exists.
Do I need a PLC, or is PID control enough?
PID holds set temperatures and leaves sequencing to the brewer. A PLC automates the sequence and makes repeat brews more consistent, with a higher panel cost and more training. ZR Brew supplies both.
How much does a brewery equipment package cost?
There is no standard public price list. A quotation is built from capacity, vessel quantity, heating, automation, material, components, utilities, shipping, installation and certification needs, so an itemized quote from the ZR Brew project team is the only reliable number.
Is refurbished brewery equipment an option?
ZR Brew supplies refurbished brewhouses, fermentation tanks, bright beer tanks, kegs and packaging-support equipment. Warranty coverage for refurbished equipment is determined by equipment condition, refurbishment scope, and the final sales contract.